About Us
The Lara Project: A Critical Metal Deposit With Significant Gold and Silver
-
Developed Between 1982 and 1992
-
Historical Resource Estimates from Kelso and Wetherup, 2008 Technical Report
-
Confirmation drilling planned for Q1, 2025
Indicated Resource:
1,146,700 tonnesInferred Resource:
669,000 tonnesNumber of drill holes to date
323Total Drilling:
58,262 meters* Nova Pacific Metals has not done sufficient exploration to classify the historical estimate as a current resource and the Company is not treating the historical estimate as a current resource.
Lara VMS
Of particular note is the intersection from hole 24BP05, the upper 2.2 m of which intersected massive light brown sphalerite, galena, and disseminated chalcopyrite. Samples across the full 4.26 metre hole returned a weighted average of 12.5 g/t Au, 409.3 g/t Ag, 37.92% Zn, 5.29% Pb and 2.31% Cu. A 0.9 m intersection from hole 24BP03 also returned 52.76% Zn.
These numbers compare favourably with Abermin’s trench results, but should not be considered representative of the average grade of the deposit, given the limited scope of the drilling program.
Hole 24-BP 05
Gold 21.70
Silver 14.98
Silver 14.98
g/t Ag
Copper 2.67%
Lead 4.58%
across 2.2m
Our Commitment
Qualified Person
The technical information included in this website has been reviewed and approved by David Nelles, P.Geo., a consultant to the company who is not independent, as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI43-101”)
Latest News
December 10, 2024
Vancouver, British Columbia, Canada, December 9, 2024 – Nova Pacific...
November 27, 2024
3.0m @ 11.67 g/t Gold, 373 g/t Silver, 21.33% Zinc,...
November 14, 2024
Vancouver, British Columbia, Canada, November 14, 2024 – Nova Pacific...